Name:
FoD Pilot
Start Date:
Preparations for the pilot started in June 2017, the users are on-boarded to the pilot in October 2017.
End Date:
Expected end date for pilot is beginning of February 2018.
Pilot Description:
The pilot should test FoD version 1.5 especially its new features including:
- traffic filtering based on the specification of port ranges
- traffic filtering statistics
The pilot will include security team in GÉANT Operations Centre and the following NRENs: RedIRIS, LITnet and EEnet.
Pilot Category: Technology / Service
This is a technology pilot, with its focus on the new features that are present in FoD v 1.5 and were not available in the current production version FoD v1.1.
Required Infrastructure:
The infrastructure that is needed for the pilot includes:
- A server with pre-installed FoD v1.5 version enabled on the networks of the NRENs that participate in the pilot - it is provided by GEANT OC and supported by JRA2 T6 team
- End-user testing equipment - participating NRENs will ensure this equipment for themselves
Pilot participants are welcome to contact JRA2 T6 team members: Evangelos Spatharas (evangelos.spatharas@geant.org) and David Schmitz (David.Schmitz@lrz.de) about the pilot.
David/Evangelos - please include names and e-mails of NRENs' representatives
Users:
FoD direct users are NOC and/or CERT engineers that implement the rules, and secondarily NRENs and any GÉANT project participating organisation.
Three NRENs participate in the pilot: RedIRIS, LITnet and EEnet.
Objectives and means of verification:
The list of objectives, critical success factors and the means of its verification is provided in the attached xls sheet.
Communication plan:
The communication with pilot participants is currently organised directly between the two T6 participants and NRENs' representatives.
Explain how will the team communicate with pilot participants, e.g. regular (weekly/bi-weekly/...) meetings, mailing lists, instant-messaging channels,...
Additional documentation:
Provide (links to) any additional documentation as needed.
If this is a pilot of a technology, provide relevant links about the technology that is being tested, previous related work in and outside of GEANT project.
If this is a pilot of a service, provide links to Service template completed for this service.