D1 - Inception reportFeb 2012To  elaborate on the methodology that will be used to carry out the study, will provide details on the resources and articulate the objectives

D2 - Interim study report




Apr 2012

To cover the intermediate results for the objectives listed above, specifically:

  • Objective 1: the result of the survey will become available; a selected number of use-cases will be used to determine how the current AAA infrastructures support them.
  • Objective 2:  the   the state-of-the-art  survey on the existing AAA infrastructures survey will be in its final stage and complete.
  • Objective 3: some technical, organisational and legal obstacles will be identified in the analysed AAA Infrastructures and initial .
                        Initial proposals will be formulated, specifically on how to overcome the barriers to effectively move towards the provision of common cross-domain and
                        European-wide AAA services suitable for information resources.
 
D3 - Final study reportJune 2012

To

present

report on the

final

results and recommendations of the study.

The final study report will take into account inputs received during the Final Workshop (see below), the internal meetings with the EC and the feedback received by the consortium liaisons

, such as REFED,

.

(For example TERENA will consult  REFEDS and TF-EMC2

etc

groups for feedback).

Final workshopJuly 2012To present the preliminary results to the study and receive feedback. The workshop will be organised at the Commission’s premises in Brussels.
D4 - Technical ReportAug 2012To report on the use of resources in the performance of the contract including e.g. time-sheets on man/days consumption, travel details, use of consumables, etc.

...