...
- Month 0-8, CM 12-2016:
- To study current implementation of BoD service
- Propose technical aspect of improvements for BoD service
Wiki Markup To propose solution for GTS VCs over the GEANT core (or \[improved\] BoD)
- Prototype solution for OpenNSA
- Month 9-14, CM 06-2017:
- Investigate provisioning of E-Line type service using NSI (ultimate goal – to replace current BoD service)
- Deliver OpenNSA ready to deploy in Geant to support GTS Vcs, BoD and Geant Plus; CCSv1
- Start effort with T2 on integration of the proposed service into OSS/BSS tools which are being developed in T2 – E-Line
- Investigate QoS for CCS
- Month 14-20, CM 12-2017:
- Investigate lambda services and their integration into CCS
- Deliver OpenNSA ready to deploy with OTN circuits support (sollution for consolidate Geant wave service); CCSv2
Wiki Markup Implement multi-domain \[NSI\] operation with first adopter in production
- Month 21-26, CM 6-2018:
- Cooperate with operations and NOC to collect requirements for CCSv3
- Connection service portal – replacement for BoD portal, can be used for implement Geant plus as well
- Service status check and fail recovery procedures
- Prepare internal demo of Connection Service GUI
Wiki Markup Extend multi-domain \[NSI\] operation
- NetherLight will be most important MultiDomain This provides general access to a large OXP and will to allow JRA1-T3 to begin testing to reach commercial transport services at NetherLight.
- CESnet – required for GTS
- NORDUnet - required for GTS
- AutoGOLE – Network research community
- CIENA (North America) - required for GTS
- StarLIght – Chicago OXP
- Pilot CCS/ELINE
- Cooperate with operations and NOC to collect requirements for CCSv3
- Month 27-30, CM 10-2018:
- Inter-domain topology distribution: Resolve SPA topology with NML specifications and distribution standards
- Rename and rebrand the GEANT Connection Services ("GCS" ?); CCSv3
- Migrate BoD:
- Integrate and merge BoD service end points into CCS/ELINE service.
- Migrate existing BoD service instances to CCS/ELINE.
- Migrate GEANTplus:
- Integrate and merge GEANTplus service end points into CCS/ELINE domain.
- Migrate G+ service instances to CCS/ELINE service
- Migrate BoD:
- Prototype Multi-Point CS, also as abstract resource within GVM model
...